Step 1:
Determine wall location. Dig a shallow trench for wall base. Place
granular leveling pad material. Compact and level the base pad.
Place and level the first course units. If grade changes along base
of wall, create stepped leveling pad as required. Always start wall
at lowest elevations, working to highest. Complete base course before
proceeding with additional courses. |
Step 2:
Place a 4” perforated drainage pipe behind 1st course then
backfill first course units with clean granular fill material. Compact
with hand tamper or appropriate vibratory plate tamper. Backfill
and compact behind each course before installing |
Step 3:
Starting at straight wall area, place units centered over joint
of units below to form a running bond pattern. Build through curves
in similar manner. Note: At curves, course bonding will adjust sideways.
If stack bond occurs, (seams begin to line up) remove rear interlock
lip or cut units accordingly to get back to running bond. Finish
the wall with installation of cap units using Keystone KapSeal adhesive. |